FEATURED PROJECTS
View our featured projects below, then get in touch with us.

Hersden
The works at Hersden began with the preparation and excavation required for S278 and S106 connections, ensuring the ground was opened to the correct depth and alignment.


Costa Coffee
Excavation of the foundations to the required depth and dimensions, followed by the pouring of concrete into the foundation areas to create a stable base.

Suffolk Avenue
Excavation of foundations to the specified depth and dimensions. Concrete foundations were then installed to provide a solid, stable base for the structure.

Wingham Country Market
Excavation of the foundations to the required depth and dimensions, ensuring proper soil preparation.