Project name: Suffolk Avenue
The works commenced with the excavation of foundations to the specified depth and dimensions. Concrete foundations were then installed to provide a solid, stable base for the structure. Following the foundation installation, internal drainage systems were laid, and surfaces were prepared to ensure efficient water management and a level base for further construction.
The substructure was then built, and block and beam systems were installed to provide a strong and secure framework for the building. Finally, external drainage systems and services were installed to ensure proper water management and connectivity to essential utilities, ensuring the infrastructure was fully integrated and operational.
Client
Square Circle
Location
Westgate, Kent
Scope of Work
Foundations, drainage and surfaces