Project name: Cheney Farm

The works at Cheney Farm in Gravesend included preparing the site and foundations, breaking out existing slabs where required, excavating and pouring reinforced concrete pads, and constructing a 450mm blockwork upstand with black engineering brick. Drainage works involved installing a new cess pit, connecting foul drainage, and installing a rainwater harvesting system with a stormwater crate soakaway.

The structural steel frame, mezzanine, staircases, thermal wall panels, and roof panels with fixed rooflights were installed ready for a green roof. All works were integrated with the existing building, and follow-on works included strengthening the roof for photovoltaic panels, replacing the roof and cladding with insulated panels, installing new rainwater guttering, and completing trenches and backfill for drainage crates.

Client
BB Contracts
Location

Gravesend

Scope of Work
Excavation and preparation of foundations, installation of reinforced concrete pads, construction of blockwork upstand, installation of drainage systems.